Agentic Coding Moves Your Bottleneck
Agentic coding makes development faster, sometimes dramatically. That doesn’t make the team faster. It moves the bottleneck, and the process has to change with it.
Context
When teams embrace agentic coding, the development stage of a story gets faster — sometimes dramatically. But this doesn't mean the team gets faster. It means the team's bottlenecks shift. Suddenly the problems are:
- How do we review and test changes at the pace they're being produced?
- How do we deal with PR pileup?
- How do we keep generated code from degrading the system?
- How do we supply the team fast enough with the right problems to work on?
- How do we protect engineers from a new kind of burnout — one driven by review fatigue, not coding fatigue?
A 2-week sprint often feels out of phase with this reality. You plan two weeks of work, and some engineers finish their code in three days. Now what? You need faster feedback and much quicker communication across the team. Teams that already work hard at smooth handoffs will have less trouble here.
When an engineer finishes a task, they have a choice - do I pick up something new, or do I look for who needs help? Those teams who have the habit of helping each other are going to have an easier time adapting to the agentic flow.
Teams where daily standups feel like an obligation and everyone works solo are different. Those teams don't have the habits that support this shift.
Discussion
Two-week sprints have always been useful because they highlight problems in your process. But they aren't the only way to do that. When cycle times drop far enough, the sprint boundary itself becomes the problem.
When to shift to Continuous Flow
We've had a couple of teams reach this point and want to rethink their process entirely. This means drawing from the Kanban world. In Kanban, teams focus on single-piece flow: rather than selecting a two-week batch of work, they agree on limits to how many items can be at different stages at once. By keeping work in process low, they speed up the flow of value.
One approach, from Mike Burrows' book Kanban from the Inside, is called "reverse STATIK." It's a set of diagnostic questions the team works through on an ongoing basis. They map well to the specific pressures agentic coding creates:
- How do we balance demand and capability at each stage of our workflow? (When dev capacity outpaces QA or PM capacity, this question becomes urgent.)
- How can we refine our existing systems — tools, meetings — to address the problems of today? (Not last quarter's problems.)
- How do we address sources of dissatisfaction and other motivators for change? (Engineers idle while PRs pile up at review. Testers overwhelmed. PMs can't write stories fast enough.)
Burrows' framework is worth reading in full. The point here is that you don't need to invent this from scratch — there are good tools for this kind of diagnosis.
How agents change team dynamics
As code production speeds up, it applies pressure on every other stage. And your staffing probably isn't keeping up.
If you still rely on manual QA, your testers are going to get hammered. If your tech leads review all PRs, they're going to be slammed. And if you've already solved both of those problems, you probably don't have enough PM capacity to keep new work flowing into the team.
The team needs to look at the flow of work across stages. See where queues are piling up. See where queues are starved for inputs. What you might find, if you're like us, is that you have overloaded PMs and testers and a few idle devs.
So naturally, you should just pressure the PMs and testers to work harder. (I'm kidding.) There's a staffing imbalance now, and telling people to go faster doesn't fix it.
You have two options. Either the team stretches out of their current roles to support each other, or you let go of some devs to hire more PMs and testers.
I don't like the second option. These are people with deep context on your systems and your customers. Losing that institutional knowledge is a waste, and the signal it sends to the rest of the team is terrible.
The better path is for the team to adapt together. This can take a few forms.
Engineers move downstream. They take on more of the QA and review burden — looking at ways to use agents to automate these stages. Maybe you build a multi-agent review process that catches bad PRs before a tech lead ever sees them. Steve Yegge, in his book Vibe Coding, suggests engineers working with agents should spend 40% of their time on cleanup, refactoring, and automation. If that's true, some of that 40% should go toward automating the review and testing bottleneck, not just cleaning up their own code. But this is a challenge the engineering team needs to talk through together, or they'll work at cross-purposes.
Engineers move upstream. They help PMs with definition and analysis work. For this to work, PMs need to operate at a higher level of abstraction — not just telling the team what stories to build, but why. Not what features to ship, but what does success look like for the customer? Paradoxically, to absorb more engineering capacity, PMs have to get better at strategic storytelling: writing clear briefs about initiatives and outcomes, so that engineers can take on more at the story level with less guidance.
An aside - I don't think this means PMs need to be using AI to generate stories and handing those stories to the devs. There needs to be conversation within the team about what elements of cognition we are delegating to AI. Selection of stories and scope is one of the biggest levers we have to steer. But we may find it makes more sense for the PM to clearly define a feature - its goals, its success criteria, and its constraints - and then for the engineers (together with their agents) to define the more detailed stories (or Beads, if your team is using agent-native tools for that) In many cases a feature can be completed in a fraction of the time a story could be done before, and that means everyone moves up to a higher level of abstraction.
As this happens, some rituals change form. Backlog grooming might dissolve when engineers with idle time start looking at earlier stages of the process — even undefined work items. This is especially useful because engineers are learning about agents faster than anyone else in the org. They'll spot opportunities to introduce agents at stages the PMs might be missing.
You know you're doing it right when an engineer and PM start pairing on how to automate backlog creation and arguing about whether to do it in Jira or Beads.
Play
This whole thing is an adaptive challenge. Everyone is learning how to work with AI at different speeds. What works this week won't work the same way in six months. So it's not a one-shot transformation, but rather a new way of learning and adapting together.
We have good frameworks for adaptive challenges. What I've learned from Mike Burrows is that participation matters, and agreeing on outcomes matters.
Start here:
- Agree with the leadership and the team on where you want to get to — short, medium, and long term.
- Define experiments together to get there.
- Check in on the experiments every week to see what you're learning.
As a leader, you will be tempted to suggest the experiments you think the team should do. But the team is closer to the work. They know what the challenges look like. The product leader's job here is to create the space for those experiments to happen, not to prescribe the answers.
AI is moving faster than any one individual can keep up. Our only hope as organizations is for our people to learn and adapt together, every week.
For more on the adaptive challenges we face these days, check out last week's talk:
Here's a recording of the talk, with a 10-year-old picture of me 🤦♂️